With El Nino ragging thru the southern states and Climate Changing performing as advertised, with more frequent extreme events, it is no wonder that the weather is the main event on the evening news, even with all the Tomfoolery in Washington DC. The entire ocean is record warm now, not only the Southern Oscillation, as this massive heat sink lag catches up with the systemic heating of our atmosphere. Huge floods and runoff events have inundated rivers, have filled some local lakes and even added 4-6% capacity to Lake Powell. (This is nice but Lake Powell needs 10 feet of snow over 100,000 square miles to fill again. Snowpack fills our big dams.) Some people seem surprised at these events, but they have been prophesied by engineers, meteorologists and hydrologist prognosticators for the last 75 years as maximum possible storms, 40 years as Climate Change and 2 years as El Nino.
Back in the day we used to design
dams for the Probable Maximum Flood (PMF) from the Probable Maximum
Precipitation (PMP) because Probable Maximum Storm (PMS) was already taken.
There was no rational reason for a high hazard dam, one capable of killing
someone, to breach because you couldn’t forecast max floods or you saved money
on a cheap emergency overflow spillway.
This PMF was the Deterministic, proverbial line in the sand,
million-year flood. These floods were
used to design dangerous large dams, volatile nuclear power plants, prized golf
courses and grandma’s rose garden, depending on your priorities. It took a lot of money and disproportionate
resources to provide this level of protection at all dams. A big dam would not fail in a max storm but
all the schools in the floodplain would wash away in the successfully routed
flood. There was lop-sided spending and
no one to insure risk consistency between all the hazards we face.
To calculate the PMP for a dam, we
would look at all the biggest historical storms and largest ones the atmosphere
of the last 10,000 years could possibly physically produce in a drainage basin. Then we would maximize them, to account for
things like climate change, politics, economics, error bias, and the things
that we didn’t know that we didn’t know.
We weren’t even allowed to say the words climate change back then, so we
didn’t feel too bad about rounding up.
The PMP for Utah came from a storm
near Mogan in 1958 that dropped 6 inches of rain in 45 minutes. There were full buckets, barrels and hubcaps
that proved that it rained hard and anecdotal tales, but there was no paleo
evidence of a PMF that would result from rain like that (like a stick, rock or
cat stuck high up in a tree). Sometimes
the PMP would not give you the PMF depending on temporal or spatial
distribution of the storm, the antecedent saturation or post-apocalyptic burn
scars in the watershed. But the storm,
that formed from two colliding thunder cells, was extrapolated by NWS-NOAA on
paper to 72 hours over 200 square miles and became the design anchor storm for
the intermountain west. That’s when dam
spillways got real expensive
We spent a ton of money on spillways
to the point where the new Trial Lake Dam spillway was bigger than the
Jordanelle Dam spillway and sometimes the design spillway was bigger than the
dam. Something had to give. Dam engineers started to look at a more
consistent, Probabilistic approach that considered dam beach flood risks with
all the other non-voluntary risks in society and tried to spend the money where
we could get the most bang for the buck.
We also looked a Significant Incremental Damage Thresholds for inflow
floods that were bigger than potential dam breach floods, when no one would
care. Terms like ‘acceptable risk’ and the ‘cost-to-save-a-life’ got around the
fact that we were putting a value on human life. This didn’t seem too bad since the
probabilities were very small.
But these rare beach events would
happen, and we didn’t want to be the cold, callus, calculating engineer siting
on the witness stand telling the widow why her family was killed so we could
save money. So, the burden of
determining acceptable risk was put on our elected officials who, of course,
chose to punt. We depend on vague ideas
of ‘Industry Standards’, ‘Act of God’ and the But-For defense where a failure
would have happened no matter what we had done.
This was a small comfort for engineers and hydrologists who would be
hung out to dry anyhow. Doctors put
their mistakes in graveyards, lawyers put theirs in jail, while engineers and
hydrologists hang their dirty laundry out on the line for all the world to see.
With the increased frequency of
severe storms, as we predicted 40 years ago, we must come to terms with seeing
a 100-year flood every 5 years. We have
come through the Stewardship periods of Environmentalism - which then got a bad
radical name, Sustainability – which got overused at colleges, Adaptability –
implying surrender, and Resilience – implying toughness. Now we have Discontinuity, Disassociation or
Sui Generis – where what is happening now has nothing to do with what happened
before. That is what is happening with
our atmosphere, climate and storms.
Our Probabilistic models have no
relevant historical data to decipher anymore, and we must go back to our
Deterministic models that physically simulate the atmosphere, the drainage
basins and the river channels with pixelated, finite elements that make up our
hydrologic systems. Slap some NextRad
radar over some GIS terrain models and out pops the flood. Luckily these models are good enough and
computers are fast enough, with Ai assistance, to help model these things as
they happen. We now have 2D and 3D
models that help with Computational Fluid Dynamics (CFD). With quantum computers there will be no
coincidences and there should be no surprises with real-time forecasting. Necessity is the mother…. The proverbial PMP-PMF line in the sand may be
moving, figuratively and virtually, but at least we should be able to keep up
with it. Even a blind man knows when it
is raining.